Exam 2 is about the paperwork that keeps people alive: the joint site inspection before the permit is issued, the hazard analysis checklist, and the rules on how long a permit lasts.
Many candidates mix up renewal and transfer. Several questions here test exactly that, together with when a permit has to be closed and who must stop the work.
Loading the exam (48 questions)…
Points this exam keeps coming back to
- The joint site inspection is done before the permit is issued, led by the issuer or his designated representative.
- The hazard analysis checklist is the cornerstone of the permit form, which has 4 sections.
- A normal permit covers one shift and never more than 24 hours including renewals. An extended permit can run up to 30 days only when conditions are very unlikely to change.
- A renewed permit cannot be transferred, and a transferred permit cannot be renewed.
- If the site becomes unsafe, work stops and the reason is written on the permit.
Frequently asked questions
How long is an Aramco work permit valid?
A normal permit covers one operational shift and cannot go beyond 24 hours including any renewal. An extended permit can cover up to 30 days, but only when site conditions are highly unlikely to change.
What happens if the hazard analysis checklist was not completed?
The receiver does not sign. If work has already started, he stops it and informs the issuer.
Who closes the permit?
Both the issuer and the receiver sign to close it, when the work is finished or the crew leaves the site.
More Aramco WPR exams
- All Aramco WPR exams
- Exam 1: Permits and certificates
- Exam 2: Joint site inspection
- Exam 3: Gas, excavation, stop-work
- Exam 4: Lockout and isolation
- Exam 5: Confined space
- Exam 6: Restricted areas
- Exam 7: Gas testing, H2S, excavation
- Exam 8: Height, PPE and lockout
- Exam 9: Confined space and permits
- Exam 10: Permit rules and stop-work
Unofficial practice for training only. This site is not affiliated with Saudi Aramco, and these are not official exam questions.